Thursday, August 29, 2013

MEASURE UMPTEEN TIMES...CUT ONCE

The old saying is "measure twice, cut once". I am now involved in the stairway and it's more like measure 3 or 4 times and cut once. I've got the two box newels pretty much complete. For both of them, I used a sturdy piece of 1 1/2" x 3 1/2" solid oak which extends from the framing below the subfloor and runs up into the newel about 18". This allowed me to get a very sturdy installation without any external screw or mounting brackets at the bae. In other words, it's a very clean look and solid. It's a little nerve wracking cutting into these pieces since they are around $100 each plus they are prestained. So, one bad cut and it sets me back on the schedule and also in the pocketbook. That's why I measure more than twice before cutting. Some of you may recall our stirway in the house on Neal-Pearson. I set the bar pretty high when I installed that one as it came out really nice even though I never had any prior experience putting in a stairs. That one was actually more difficult because the open side required compound miter cuts where the skirt board and risers intersected. Plus, that was oak which is a little harder to work with. For this one, I am using poplar except for the tread, which are maple to provide added durability.







Above pics are from the stairs I built 25+ years ago.
Below is the modest progress made through today on the new house.







Monday, August 19, 2013

COMING OUT OF THE CLOSET

No, it's not what you think. I've been working on shelving in the closets over the past few days and still have the kitchen pantry to finish up. As you can see, I installed the Closetmaid units in the walk-in closet and it turned out pretty nice.


In the other closets, I am using the the wire type shelving, Rubbermaid in this case.


Friday, August 9, 2013

BACK BY POPULAR DEMAND


Well, I don't know that the demand was popular but there was at least one stalker crying for more. Sorry for the long period of silence.

There have been some significant changes since my last post....carpeting is now in, kitchen and master bath countertops have been installed and the shower is complete except for sealing the grout.









We are thrilled with the tile work. Tom Cramer who lives here in Tipp City was really helpful in making suggestions on how to make it look nice. We kept things simple with no accent pieces, etc. but it is nevertheless attractive.

I have been tackling the job of outfitting the walk-in closet. You may recall that we were able to score a good deal on a bunch of ClosetMaid product a few months back. We returned to that store and picked up some light fixtures that were marked at about 1/2 the price they originally sold for in Home Depot.

Earlier this week I had a an engineering firm come out and check elevations so that we can submit a Letter of Map Amendment, or LOMA. "A LOMA is a letter from FEMA stating that an existing structure or parcel of land - that is on naturally high ground and has not been elevated by fill - would not be inundated by the base flood." Since a portion of our lot IS in the flood plain, we would have to pay for flood insurance without the LOMA. The LOMA essentially establishes that our house is NOT in the flood plain even though some parts of the lot are. This will allow us to insure the house without paying for flood insurance.

The major project left on my plate is finishing out the stairway. Material is in the shop of the guy that is doing our staining. As soon as he delivers the stained poplar to the house, I can get started on that.

The plumber started with the final stage of his work and was out to install some valves where fixtures will go. By this time next week we should have a working toilet so I will no longer have to commiserate with the "bears in the woods".