I have yet to post a pic of the porch since Barb finished staining the timbers so here you go...
As you can see, the front door still has not been stained. Part of the reason is that we have not been able to decide on a suitable color. Anyone starting to detect a recurring issue here? We are leaning towards a dark brown color. Anyone care to give their two cents worth?
Monday, June 24, 2013
Sunday, June 23, 2013
BIG SPIDERS
Several posts back I wrote about big spiders (among other creatures) lurking about our new house. Thankfully the house is pretty tight so they are outside instead of inside.
Yesterday I was moving a tarp around and spotted this fella' shown below....
As you can tell from the ruler, his leg span is about 3". I suspect that if we ever start discovering these INSIDE the house, Barb will have us putting up a "For Sale" sign in short order.
Since we started building, I have seen more snakes than I saw in the entire 25 years we lived on Neal-Pearson Road. Don't know whether it's because we are in the woods or because of the river....probably a combination of the two. On the plus side, we are also seeing lots of birds that we never or rarely saw at our old house. Occasionally we hear a big old bullfrog down at the river so the sights and sounds are an interesting change from what we were used to.
Yesterday I was moving a tarp around and spotted this fella' shown below....
As you can tell from the ruler, his leg span is about 3". I suspect that if we ever start discovering these INSIDE the house, Barb will have us putting up a "For Sale" sign in short order.
Since we started building, I have seen more snakes than I saw in the entire 25 years we lived on Neal-Pearson Road. Don't know whether it's because we are in the woods or because of the river....probably a combination of the two. On the plus side, we are also seeing lots of birds that we never or rarely saw at our old house. Occasionally we hear a big old bullfrog down at the river so the sights and sounds are an interesting change from what we were used to.
Wednesday, June 19, 2013
GRASS FLOOR?
Last Thursday, the flooring installers showed up to put down the "wood floor". Actually, it is bamboo and since bamboo is technically a grass, I guess you could say we have grass floors rather than wood floors. This stuff is significantly harder than oak so it makes for a durable surface.
Unfortunately, the sales people at Lowes screwed up when they told me that it could be stapled or nailed down even though it is designed to be a floating floor. My plan was to have the floor installed all the way to the walls in the kitchen and then set the cabinets on top of the flooring. Since it became necessary to change to a "floating" installation, I became concerned about setting the cabinets on the flooring. The concept of floating is to allow the floor to "move" if it wants and having cabinets installed over the flooring is normally not recommended since it will prevent the floor from moving. So, I called Lowes and explained THEIR mistake and asked about installing the cabinets on the floating floor. He assured me it would be OK. On that basis, I had the flooring guys go ahead with the floor in the kitchen. The next morning, I called the manufacturer with a question and decided to ask him about cabinets installed over the floating floor. He said no way that should be done. As a result, I instructed the flooring guys to pull up what they had installed in the kitchen and explained that they would have to put it back down after the cabinets were in place. Grrrr!
On Saturday and Sunday, a guy that had been recommended by the cabinet shop and I installed the kitchen cabinets. We got most of the job complete but there is a some trim work that will have to be done later after we get the necessary moulding. Yesterday, I had the electrician come out and help me install the microwave and the oven in the tall cabinet that houses both appliances. We have had appliances sitting in Sears back room since November and I am sure they were happy to get rid of some of it. We still have a refrigerator and dishwasher there but should be able to get those items soon.
On Monday, the excavator started installation on the septic tank and leach field. I'll report more on that in the next post. In the meantime, I'm continuing work on hanging interior doors and trimming them out.
Unfortunately, the sales people at Lowes screwed up when they told me that it could be stapled or nailed down even though it is designed to be a floating floor. My plan was to have the floor installed all the way to the walls in the kitchen and then set the cabinets on top of the flooring. Since it became necessary to change to a "floating" installation, I became concerned about setting the cabinets on the flooring. The concept of floating is to allow the floor to "move" if it wants and having cabinets installed over the flooring is normally not recommended since it will prevent the floor from moving. So, I called Lowes and explained THEIR mistake and asked about installing the cabinets on the floating floor. He assured me it would be OK. On that basis, I had the flooring guys go ahead with the floor in the kitchen. The next morning, I called the manufacturer with a question and decided to ask him about cabinets installed over the floating floor. He said no way that should be done. As a result, I instructed the flooring guys to pull up what they had installed in the kitchen and explained that they would have to put it back down after the cabinets were in place. Grrrr!
BAMBOO FLOOR IN SUNROOM
On Saturday and Sunday, a guy that had been recommended by the cabinet shop and I installed the kitchen cabinets. We got most of the job complete but there is a some trim work that will have to be done later after we get the necessary moulding. Yesterday, I had the electrician come out and help me install the microwave and the oven in the tall cabinet that houses both appliances. We have had appliances sitting in Sears back room since November and I am sure they were happy to get rid of some of it. We still have a refrigerator and dishwasher there but should be able to get those items soon.
Had a somewhat embarrassing situation today.... I noticed the absence of a floor register in the laundry room. I called the HVAC contractor and asked if they would normally have one in the laundry room. He answered in the affirmative and asked me whether it had perhaps been covered up. I discovered that when I put the underlayment down in that room, I did just that! Fortunately it's an easy enough problem to solve...I'll just cut out the flooring in that area.
On Monday, the excavator started installation on the septic tank and leach field. I'll report more on that in the next post. In the meantime, I'm continuing work on hanging interior doors and trimming them out.
Monday, June 10, 2013
THE LATEST
Most of the past week has been spent on the laundry room. I put down underlayment and Barb and I together put down the tile. It came out really nice if I do say so myself.
I also set all the doors in the laundry room and trimmed out the window. Still have to trim out the doors but we want to get a coat of paint on the wood before it goes up. Unlike the trim in the rest of the house which is stained, the laundry room will be painted white. We will, however, be using the same design.
As you can see, I also installed the cabinets in this room.
The wood flooring is scheduled to be installed Thursday and Friday. I have a guy lined up to install the kitchen cabinets and I will be helping him with that on Saturday and Sunday. Then, the flooring people come back Monday to put down the carpeting.
This week I will be working on the flooring in the master bathroom and also installing the vanity. The tile guy started on the walk-in shower and hopefully he will make some progress there this week. If I get that done, I will start setting some of the stained doors in areas where carpeting will be installed.
Next week I am expecting the excavating contractor back to install the septic tank and leech field. Then we can get the plumber back to run the line from the house to the septic tank and at that point toilets can be connected.
I also set all the doors in the laundry room and trimmed out the window. Still have to trim out the doors but we want to get a coat of paint on the wood before it goes up. Unlike the trim in the rest of the house which is stained, the laundry room will be painted white. We will, however, be using the same design.
As you can see, I also installed the cabinets in this room.
The wood flooring is scheduled to be installed Thursday and Friday. I have a guy lined up to install the kitchen cabinets and I will be helping him with that on Saturday and Sunday. Then, the flooring people come back Monday to put down the carpeting.
This week I will be working on the flooring in the master bathroom and also installing the vanity. The tile guy started on the walk-in shower and hopefully he will make some progress there this week. If I get that done, I will start setting some of the stained doors in areas where carpeting will be installed.
Next week I am expecting the excavating contractor back to install the septic tank and leech field. Then we can get the plumber back to run the line from the house to the septic tank and at that point toilets can be connected.