I finished installing the balusters on the stirs and it sure made a big difference in the appearance. As is not uncommon, I ran into somewhat of a snag. Without going into all the ugly details, I had to cut the balusters to length with part of it coming off the top and part of it off the bottom. Many tasks are simplified with jigs and/or fixtures and this one was no exception. I built a simple jig to hold the balusters so that I could make the cuts. I used a thin cutoff wheel in my 4" grinder and it proved to be the ideal tool for making these cuts.




Remember that tangle of wires that I showed pics of when we were framing? Earlier this week, I cut a hole in the closet wall and exposed all of the wiring. My main objective was to get access to the wires for the smoke detectors since these need to be operational for the inspection. After we are moved in, I will deal with the security portion of the system. Shown below is a shot of the control panel and the collection of wires. Although it had been 25 years since I last installed a fire/security system, everything started coming back to me and the installation and startup when smoothly.

Yesterday we had final inspection for the plumbing and we finally have running water, operating toilets, hot water and other amenities. Even though we have sump pit, I was hoping that we would not be required to equip it with a pump. That might sould strange but the main reason I wanted a sump pit was in case I ever need to install radon mitigation. The fact is it will probably never see a drop of water from the footer drain. Well, the plumbing inspector said that I have to drain the water heater pan to the sump and thus I need to also have a pump installed. This despite the fact that the only way the pump would ever need to operate would be if the water heater leaks or if the pressure relief valve was to actuate.
Since I will have a pump in the sump pit I will now run the softener drain to the sump as well rather than to the sewer pit.The good news is that the inspector will allow us to move in even though this work is not complete.
Speaking of moving in, we have the final inspection for the other items (i.e. electrical, HVAC, etc) scheduled for this coming Tuesday and have the movers scheduled for the 7th. We're keeping our fingers crossed that there are no surprises Tuesday and that we can proceed as scheduled.
Today I set the door between the utility room and hallway. Since there was so much traffic through this doorway, I decided to leave it till this point in time. Tomorrow I will be working on some baseboard that had been left undone because adjacent items such as the stairs and aforementioned door had not been installed. The electrician will be finishing up the last items on his list over the next day or two so that we will be ready on Tuesday.