This post is dedicated to my nephew Kevin who reported that he has been experiencing withdrawal due to my dearth of updates.
I am starting to think that we should stark work on an Ark instead of the house. More rain today. It's not that we have gotten a lot of rain...it's just that it has been raining frequently. Since the subfloor was put down about 3 weeks ago, parts of it have been soaked seven times now. Today the foyer got wet due to the fact that the front porch is not yet complete and the roof over the foyer can't be completed until we get the porch complete.
Since my last post on Thursday of last week, we have made great progress.Except for about a days worth of work to complete the front porch, all the framing is complete. Yesterday they installed the windows and also started on the decking for the screened porch. The latter task was completed this AM.
Since Forest Products created a bit of a mess when they delivered I joists and beams way back when, they made me a pretty good deal on the decking material (or at least they say they did). The only complication is that they were reluctant to deliver it since their inability to get up our driveway previously is what caused the problem. Although I have the pickup truck and an 8' trailer , neither would be sufficient to carry 20' long pieces. So, we rented a U-Haul for a couple of hours, drove to Piqua and picked up the material and delivered to the lot.
DECKING IN SCREENED PORCH
There were a couple of errors with the windows. Two of them which were ordered with tempered glass cam e in with standard glass. The supplier will be changing those out. The two windows in the garage were supposed to have been painted but came in with bare pine interiors. The supplier will pay for the cost of painting these. Most of the windows will be stained but we saw no need to stain the two in the garage.
Both the HVAC guy and the plumber met me at the house to walk through and discuss the rough-in. The meeting with the plumber was rather ironic. Twenty five years ago TODAY, he and I were working at our house on Neal-Pearson and he was doing the rough plumbing. That was Black Monday, the day the Dow Jones Industrial Average dropped almost 22%, the largest one day percentage drop in history. For me, it was one of those days that I will always remember where I was, somewhat like Kennedy's assassination and other such events. Rick and I were listening to WLW as they reported on the market decline throughout the day, wondering when it would all end. Hopefully my decision to use Rick again for this house will not be an omen as far as the stock market goes.
We're finally making some progress with DP&L. Tomorrow, I expect to receive their invoice for the cost of the installation. I'm holding my breath. Once I make payment we can get underway with the installation of electric.
Everyone, including DP&L, has suggested that I have someone other than DP&L dig the trench for the electric cable which will run about 700' from the road to the house. So, Wednesday I met with a guy who does most of the trenching for Pioneer Rural. He told me his rate is $2.90 per foot. I met with another trencher from Greenville late this afternoon whose rate was almost half that, a potential savings of about $1,000. Unfortunately, he is not able to deal with the little creek part way up our driveway. It will be necessary to use a backhoe to dig a trench about 36" below the bottom of the creek and he does not have the equipment to do this aspect of the work. As a result, I will likely be meeting with yet a third person for this work.
I contacted the phone company to find out if they would want to drop their cable into the trench while we have it opened up. Would save someone some $'s if ewe can do this. After speaking with a prototypical utility company service rep, I was not left with a great deal of confidence that we will be able to make the logistics work on this.
On a positive note, both the HVAC and plumber will be starting work next Wednesday. Things are coming together nicely from a scheduling standpoint. We may be able to get started on the roofing late next week too which would be another giant step in getting the place "weatherproof".
I know I have mentioned before our expectations that the screen porch has the potential to become our favorite space. Now that the roof is on and the decking is down there, I am even more convinced of that. Barb is referring to it as our tree house which is apt. Because the terrain drops off so steeply, it's almost like we are in the canopy of the trees.
OUR TREE HOUSE
The porch is turning out pretty nice. We are using cedar timbers to create somewhat of a timber frame appearance. The rest of the exterior of the house is somewhat simple so we look at the front porch as THE focal point of the exterior.
FRONT PORCH
The plan is to lay stone veneer around the lower part of the posts. We will be staining bead board over the weekend which will be installed over the cedar rafters.
THE FRAMING CREW
Jeff, the elder statesman in this photo, owns the business and has been framing for about 30 years. He knows his stuff!
NEW WINDOWS AND FRENCH DOOR TO SCREENED PORCH